WhatsApp: +86 18769980869 Email: wenyujixie@gmail.com
Alluvial gold mining pumps and supporting equipment for African river mining sites.
Product

Gold Recovery Mat / Gold Rush Grass

Gold recovery mat, also called gold rush grass, is used in placer gold mining, river gold panning and small gold washing operations.

Gold Recovery Mat / Gold Rush Grass
Application Fit

Supporting Equipment for Gold Washing Workflow

Gold mining accessories support crushing, washing and fine gold recovery after sand and ore are moved by pump. They are best presented as part of a complete field package rather than isolated small products.

  • Common buyers include African mining equipment wholesalers, importers, local stores, mine owners and field contractors.
  • Common export markets include Cote d’Ivoire, Burkina Faso, Nigeria, Tanzania, Madagascar, Zimbabwe, Mozambique and other alluvial gold mining regions.
  • For heavy equipment orders, sea freight, bare packing or wooden case packing are confirmed before quotation.

Buyer Use

Suitable for repeat supply, package orders and field replacement, not just one-time model comparison.

Site Logic

Model choice depends on river depth, sand layer, gravel content, power source and the recovery process after pumping.

Package Match

Main pump, diesel power, hose, crusher, recovery mat and spare parts can be quoted together.

Order Support

OEM logo, packing requirement and configuration details can be confirmed before shipment.

For Small and Medium Gold Workflows

It helps capture fine gold particles during washing and separation and can be used as part of a practical field gold mining package.

Package Inquiry

Send mining method, water source, pump requirement, sand content, particle size and planned daily processing volume.

Product FormCarpet
MaterialPlastic
TechnicsWoven
ApplicationPlacer gold mining, lode gold mining, river gold panning
Real Photos

Gold Mining Support Photos

Crusher, gold mining grass and recovery mat photos help buyers understand how the support products fit the washing workflow.

Selection Checklist

Information Needed Before Quotation

For accurate selection, send the working condition together with the product name. It saves time and helps avoid a pump, hose or engine that is too small for the site.

Mining methodRiver gold, placer gold, dryland gold or small washing plant
Process flowCrushing, pumping, washing, separation and recovery
Package matchPump, hose, diesel power, crusher, gold recovery mat and spare parts
DestinationConfirm country, port, packing and whether buyer is wholesaler or mine owner
Package Supply

How This Product Fits a Complete Mining Package

Most field orders are not only one item. The pump, power, hose, recovery products and spare parts need to be checked together before shipment.

01

Main Equipment

Confirm whether WSA horizontal pump or LSA vertical pump is the center of the package.

02

Power and Hose

Match single-cylinder diesel engine, rubber hose, PVC flat hose and discharge distance.

03

Recovery Support

Crusher, gold mining grass separator and recovery mat can support field washing workflow.

04

Spare Parts

Prepare casing, impeller, pulley and other replacement parts for remote-site maintenance.

Related Products

Build the Right Package Around This Product

WSA Horizontal Sand Pump

WSA Horizontal Sand Pump

Often ordered together when buyers prepare a pump package for mining work.

View Related Page
Rubber Hose & PVC Flat Hose

Rubber Hose & PVC Flat Hose

Often ordered together when buyers prepare a pump package for mining work.

View Related Page
Diesel Engines

Diesel Engines

Often ordered together when buyers prepare a pump package for mining work.

View Related Page
Order Questions

Common Questions Before Ordering

Common points buyers confirm before model, quantity and shipment details.

Can this be supplied with other equipment?

Yes. Chenma can quote pump, diesel engine, hose, crusher, recovery mat and spare parts as one package.

Is OEM or logo customization available?

Logo, packing and selected configuration requirements can be confirmed before production.

What is the normal delivery time?

Delivery depends on model and quantity. The customer’s current planning range is normally 10 to 40 days.

Quotation Information

Send product model, quantity, working site, power condition, hose length, destination country and any photos or videos.

Send Working Conditions for Matching

Share flow rate, head, slurry material, particle size, power source and destination country. Chenma will confirm the suitable product and package.