WhatsApp: +86 18769980869 Email: wenyujixie@gmail.com
Alluvial gold mining pumps and supporting equipment for African river mining sites.
Product

Slurry Pump Casing

Pump casing is a wear-resistant replacement component for WSA 4-16 inch sand pump systems used in abrasive slurry applications.

Slurry Pump Casing
Application Fit

Replacement Parts for Long-distance Mining Supply

Remote African mining sites do not wait until a pump stops before buying parts. Casing, impeller, second section and pulley are planned as repeat replacement items for abrasive slurry service.

  • Common buyers include African mining equipment wholesalers, importers, local stores, mine owners and field contractors.
  • Common export markets include Cote d’Ivoire, Burkina Faso, Nigeria, Tanzania, Madagascar, Zimbabwe, Mozambique and other alluvial gold mining regions.
  • For heavy equipment orders, sea freight, bare packing or wooden case packing are confirmed before quotation.

Buyer Use

Suitable for repeat supply, package orders and field replacement, not just one-time model comparison.

Site Logic

Model choice depends on river depth, sand layer, gravel content, power source and the recovery process after pumping.

Package Match

Main pump, diesel power, hose, crusher, recovery mat and spare parts can be quoted together.

Order Support

OEM logo, packing requirement and configuration details can be confirmed before shipment.

Wear Part for Abrasive Slurry

The casing contains the slurry flow and receives continuous impact from abrasive particles. Casing quality affects service life, leakage risk and maintenance frequency.

Replacement Inquiry

Send pump model, outlet size, existing casing photos, material requirement and quantity.

MaterialWhite cast iron
HardnessHRC55-65
ProcessLost foam casting, CNC machining
Applicable PumpWSA slurry pump, 4-16 inch
Real Photos

Pump Spare Parts Photos

Replacement buyers usually compare part shape and casting details before confirming pump model and quantity.

Selection Checklist

Information Needed Before Quotation

For accurate selection, send the working condition together with the product name. It saves time and helps avoid a pump, hose or engine that is too small for the site.

Pump modelConfirm WSA pump size, outlet size and existing part photos
MaterialCheck hardness, casting material and working medium before order
QuantityPrepare spare parts according to working hours and abrasion level
Repeat orderKeep model records for future replacement and local store supply
Package Supply

How This Product Fits a Complete Mining Package

Most field orders are not only one item. The pump, power, hose, recovery products and spare parts need to be checked together before shipment.

01

Main Equipment

Confirm whether WSA horizontal pump or LSA vertical pump is the center of the package.

02

Power and Hose

Match single-cylinder diesel engine, rubber hose, PVC flat hose and discharge distance.

03

Recovery Support

Crusher, gold mining grass separator and recovery mat can support field washing workflow.

04

Spare Parts

Prepare casing, impeller, pulley and other replacement parts for remote-site maintenance.

Related Products

Build the Right Package Around This Product

WSA Horizontal Sand Pump

WSA Horizontal Sand Pump

Often ordered together when buyers prepare a pump package for mining work.

View Related Page
Impeller

Impeller

Often ordered together when buyers prepare a pump package for mining work.

View Related Page
Pump Casing

Pump Casing

Often ordered together when buyers prepare a pump package for mining work.

View Related Page
Order Questions

Common Questions Before Ordering

Common points buyers confirm before model, quantity and shipment details.

Can this be supplied with other equipment?

Yes. Chenma can quote pump, diesel engine, hose, crusher, recovery mat and spare parts as one package.

Is OEM or logo customization available?

Logo, packing and selected configuration requirements can be confirmed before production.

What is the normal delivery time?

Delivery depends on model and quantity. The customer’s current planning range is normally 10 to 40 days.

Quotation Information

Send product model, quantity, working site, power condition, hose length, destination country and any photos or videos.

Send Working Conditions for Matching

Share flow rate, head, slurry material, particle size, power source and destination country. Chenma will confirm the suitable product and package.